Installation of Hardware
For this task I will be installing all the hardware, this will include the three Stone machines the company has, the three Iiyama monitors, keyboards and mice, HP printer, cabling and Wifi adapters. To start, I will be working with the layout document I made along with preparing all the hardware. Then I checked over the room again for safety, making sure nothing was left switched and no objects were in the way that could cause a hazard, I did this by carrying out a risk assessment. Noting all the dangers and numbering the dangers from 0-4, 4 being the most hazards, fortunately, in the space i was working in, all risks were reported as a 0. This gave me the go ahead to proceed with the installation of the hardware.
Implementation of all hardware went ahead as planned, I have no issues with the hardware not working. It was important for me to ensure the safety of all the employees by making sure all cables and power leads where safely hidden out of the way, this reduced any risk of the staff tripping over the leads.
I was very satisfied with the final installation of the hardware, linking back to the layout and design I had in mind for this room, it all came together and the staff were very happy with the final result.
No comments:
Post a Comment